Water Damage - Update #4

Here's the latest on the remediation project: We are planning to have a rededication of the Sanctuary on Sunday March 31. The construction is moving along as planned and we plan to have the organ reinstalled next week (not finalized) since the organ has to go back in before the pews are brought back and installed. The wood portion is being refinished since there was a lot of water damage to it. The carpet and final work in the sanctuary will be done the week of March 24. Still lots to be done. We want make sure everyone knows to continue staying out of the construction area since there are many safety hazards.

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© 2020 Saint Stephen Lutheran Church, 1155 Hillside Avenue, Antioch IL 60002 / 847-395-3359

  • White Instagram Icon
  • w-facebook